Photos for the week of February 26, 2007

Iron workers hang roof joists in Building Section G.

The final footers have been poured in Building Section B. This picture shows the foundation of the back (curved) wall of the Exploratorium.

The ramp between Building Section F and Building Section H has been installed. This will allow for the "slab on grade" to be poured in Buidling Section F in the near future.

Work continues on the grading for the main drive in the school. The break in the trees shows where the drive will be located.

Photos for the Week of February 12

The steel for Building Section F has been delivered. Building Section F will include the Media Center (Library), Large Group Activity Center, and Keyboarding classrooms.

A peek inside the building? This photo was taken from the back entrance to Building Section G. The area in the center of the photo will be the hallway and house lobby areas.

The second floor deck of Building Sections G and H has been completed.

Photos for the week of January 29

As the decking is installed, the building continues to take shape and begins to feel enclosed.

Contractors work to install metal decking on the second floor of Building Section G.

The contractor works to secure all steel beams in Building Section H. Here work is done new the future location of a skylight.

Photos for the week of January 22, 2007

Fill is moved from another area of the site to raise the location of the visitor parking lot that will be in front of the school.

Steel has been erected from the back of the building to the front in Building Sections G and H.

Work continued on erecting steel in Building Section H.

Photos for the week of January 15, 2007

Concrete is poured for the footers for Building Section A. This section of the building includes the cafeteria, kitchen, and gymnasium.

Grading begins on the western side of the building for the main parking lot for staff. This lot will be tiered.

Iron workers continue to erect steel in Building Section H. The square in the middle of the picture outlines a future skylight over the stairwell.

The size of the building becomes apparent as construction continues. This picture was taken in Building Section A (Cafeteria hallway). In the foreground is a future art room in Building Section C. Building Sections G and H are in the background.

Photos for the week of January 9, 2007

As steel goes into place, the second floor of Building Section G can be visualized.

Foundation walls have been completed on Building Section C. This picture shows the future adminstrative suite in the foreground.

Steel continued to be erected in Building Section G.

The first steel was erected in Building Section H.

Underground sewer lines are installed in Building Sections D and E.


Photos for the week of January 2, 2007

Land is cleared at the future entrance of the school at the corner of Bakerstown Road and Meridian Road. A traffic signal will be installed at this location.

Proper pieces of steel are identified to be moved into location.

A steel beam is moved into place in Building Section G.

As steel goes into place, the second floor of Building Section G can be visualized.

Photos for the week of Dec. 18th

 

Final excavation work continues in the area of the future cafeteria and gymnasium.

Footers have been poured in Building Section C. This photo shows the front entrance of the building.

Steel for Building Sections G and H has arrived.

Building Section F is prepared for slab on grade. This photo shows the location of one of the building's boiler rooms. An electrical room is in the back of the photo.

Construction begins on fire walls in the building.

Photos for the week of Dec. 11th

 

Contractors direct the concrete as it is pumped

Concrete is spread and leveled by Laser Screen equipment


Concrete is pumped on site.

Slab is completed for Sections G and H


Block work continues (Section E) shown here.

Photos for the week of Dec. 4th

Building Sections G and H Are Ready for Concrete Slab To Be Poured 12-1-06

Construction Continues and Remarkable Changes Can Be Seen

Plumbing Contractor Installs Sanitary Sewer Lines

The Future Bus Parking Area is Paved

The Ground Under the Future Media Center is Prepared

Photos from the week of 11-16-06

Foundation and Footers Are Poured for Section F

Block Walls Are Built In Building Sections G and H

Top Soil Continues to be Moved for Later Use. This is the Site of the Future Playground

Surveyors Have Laid Out Sections D and E. Orange Paint Marks the Exterior Walls

 

Footers and Foundation Walls are Dug in Building Section F. This is the Back the Future Media Center (Library)

 

The School Rises from the Ground -- Block Work Begins on the Rear Corner of Building Section H

 


Sections G and H of the Building are Laid Out

Footer and Foundation Walls are Dug

 

Storm Sewer Lines are Installed Near Bakerstown Road.

Cement is Poured for Building Footers and Foundation

A Current View of Future Adminstrative Suite (10-26-06)

A Pick-up Truck Sits on the Prepared Pad for Eastern Classroom Wing (10-26-06)

A View of the Building Site from the Western Side of the Building. Foreground is the location of Future Kitchen and Cafeteria (10-26-06)

Contractor Continues to Get Building Site to Grade

House Demolition - 1

House Demolition - 2

House Demolition - 3

Abandoned House Removed.

Building Site has been stripped of topsoil (10-12-06)

Main top soil pile close to Bakerstown Road (10-12-06)

Old house is abated of aesbetos in preparation of remove (10-12-06)

Top soil for future use on west side of property (10-12-06)

Future Staff Parking Lot (East End of Building)

Detention Pond Area Under Construction.

Future Building Site Taken From Bus Parking Area

 

 